National Thermal Power Corporation Limited - Chhattisgarh
35251112 supply, installation, commissioning, o&m for five years of grid connected rooftop solar photovoltaic system at stage 2 ntpc barauni...
35251112 supply, installation, commissioning, o&m for five years of grid connected rooftop solar photovoltaic system at stage 2 ntpc barauni...
35250851 supply installation testing commissioning onm grid connected rooftop solar photovoltaic system at st 2 ntpc barauni...
6000473 design,supply, installation and commissioning of solar photovoltaic system...
5775361 design, supply, installation 3 month trail run and year o and mm of solar photovoltaic system with minimum 30 amp output for 3 hrs. for .for electrolytic defluoridation plant at mentioned places of korba district, including change controller, smf battery in emergency switch to shift dc power from one reactor to other and other accessories needed for installation at the plant with a 3 plate electrode with electric power arrangement as stand by....
4152382 design, supply, installation 3 month trail run & one year operation and maintenance of solar photovoltaic system with minimum 30 amp output for 3 hrs. for electrolytic defluoridation plant at below mentioned places of raigarh district, including charge controller, smf battery minimum 150 a h ) , ac inverter 100 150 watts), dc supply unit, submersible pump 20 30ltr./min.) 2 nos. of ac charger for battery in emergency switch to shift dc power from one reactor to other and other accessories needed for installation at the plant with a 3 plate electrode with electric power arrangements as stand by. ...