Public Health Engineering Department - Chhattisgarh
39197537 design, drawing, construcation, testing, commissioning of intake well 6.0 m dai height – 25.18 m, 3 nos. 47 bhp vartical turbine pump raw water pump and motors, raw water clear water electric sub station 33/0.415 kv with 1000 kva transformers i/c all required work , 12.00 mld conventional type water treatment plant, 3 nos. 118 bhp for pondi khurd 3 nos. 196 bhp for salka, clear water centrifugal pump and motors,, 250 kl capacity 20 m staging mbr 1, 320 kl capacity 30 m staging mbr 2, 200 kl capacity 30 m staging mbr 3, 400 kl capacity 20 m staging mbr 4, 270 kl capacity 30 m staging mbr 5, provinding laying, jointing, testing, commissioning of raw water pumping main di k 9 350 mm dai total length – 90 m and clear water pumping main 100 mm dai di k 9 length – 7550 mts, 150 mm dai di k 9 length – 1713 mts, 200 mm dai di k 9 length – 7316 mts, 250 mm dai di k 9 length – 6545 mts, 300 mm dia. di k 9 length 6428 mts, total lngth – 29552 mts, clear water gravity main pipe di k 7 350 mm dai length – 2023 mts, 300 mm dai length – 11666 mts, o pvc pn16 250 mm dia. length –27266 m 160 mm dia length – 51238 mts, 110 mm dai length – 101307 mts, total length – 193500 mts, with all required valves specials, providing and fixing bulk flow meter, for entire scheme upto village oht’s with all allied civil works including boundary wall around wtp and mbrs campus, i type 6 nos. h type 4 nos. staff quarters, including 3 month testing and 9 months trial run under pondi khurd salka group water supply scheme of block – ambikapur lakhanpur, district – surguja (c.g.)....